Dispatching in Bonn-Bad Godesberg: Difference between revisions

From SignalWiki
Jump to navigation Jump to search
No edit summary
(sim data added)
Line 12: Line 12:


Have a more [http://www.signalsimulation.com/zoom/bonn-bad%20godesberg/ detailed look at the Bonn-Bad Godesberg panel] here.
Have a more [http://www.signalsimulation.com/zoom/bonn-bad%20godesberg/ detailed look at the Bonn-Bad Godesberg panel] here.
==Stellwerk Bonn-Bad Godesberg==
[[File:pb_kbbg.png|800px|thumb|none|Stellwerk Bonn-Bad Godesberg]]
Einige Stellwerksdaten:
* 33 switches/points/turnouts
* 64 signals
* 103 track sections
* 39 km network length in total
* 145 possible routes (train, shunt, alternatives)
* 236 buttons on the panel
* 42x18 panel tiles (= 756 panel tiles)
* 7 level crossings(5 are of type Vollschranke = Full Barrier)
* Group buttons on the panel
* Automatic fleeting
* ZNP801
* Signal Brightness  / Panel Brightness adjustable
* axle counters and axle counter reset button
New:
* Linking signal box with Bonn Hbf (after Update!)
* Linking signal box with Remagen
===Neuer Weg===
[[File:pb_kbbg_neuerweg.png|800px|thumb|none|Neuer Weg]]
===Mehlem===
[[File:pb_kbbg_mehlem.png|800px|thumb|none|Mehlem]]
===Bad Godesberg Pbf===
[[File:pb_kbbg_pbf.png|800px|thumb|none|Bonn-Bad Godesberg Pbf]]
===Bad Godesberg Gbf===
[[File:pb_kbbg_gbf.png|800px|thumb|none|Bonn-Bad Godesberg Gbf]]




{{EnglishNavBottom}}
{{EnglishNavBottom}}

Revision as of 11:14, 9 September 2011

Contents | FAQ | Manual | General Tips and Tricks | Change Log | Multiplayer Manual | Line Operations Manual | Voice Communications | Change Log | Developers pages


Page is under construction. Information is subject to change.


Coming soon


Before you get your approval to run the service on a signal box, you need to find out about the local characteristics. After training as a general trainee signalman, dispatchers were always paired with a person skilled in the signal box. This chapter is the brief introduction to the area. Read it carefully. It contains very important information.

The text is "peer to peer" written as if you are in the signal box, the first day after training.

Have a more detailed look at the Bonn-Bad Godesberg panel here.


Stellwerk Bonn-Bad Godesberg

Stellwerk Bonn-Bad Godesberg

Einige Stellwerksdaten:

  • 33 switches/points/turnouts
  • 64 signals
  • 103 track sections
  • 39 km network length in total
  • 145 possible routes (train, shunt, alternatives)
  • 236 buttons on the panel
  • 42x18 panel tiles (= 756 panel tiles)
  • 7 level crossings(5 are of type Vollschranke = Full Barrier)
  • Group buttons on the panel
  • Automatic fleeting
  • ZNP801
  • Signal Brightness / Panel Brightness adjustable
  • axle counters and axle counter reset button

New:

  • Linking signal box with Bonn Hbf (after Update!)
  • Linking signal box with Remagen


Neuer Weg

Neuer Weg


Mehlem

Mehlem

Bad Godesberg Pbf

Bonn-Bad Godesberg Pbf


Bad Godesberg Gbf

Bonn-Bad Godesberg Gbf


Contents | Sp Dr S 60 | FAQ | Manual | General Tips and Tricks | Multiplayer Manual | Line Operations Manual | Voice Communications | Change Log | Developers pages