SpDrS60 EN: Difference between revisions
Jump to navigation
Jump to search
SignalAdmin (talk | contribs) |
(added RR Crossing link) |
||
| Line 18: | Line 18: | ||
*[[Signal Group Buttons]] | *[[Signal Group Buttons]] | ||
*[[Route Group Buttons]] | *[[Route Group Buttons]] | ||
*[[RR Crossing Group Buttons]] | |||
*[[Block Group Buttons]] | *[[Block Group Buttons]] | ||
*[[Panel Group Buttons]] | *[[Panel Group Buttons]] | ||
Revision as of 21:44, 6 November 2010
This page contains operating instructions for the Sp Dr S 60 signal box simulations developed by Signalsoft Rail Consultancy Ltd.
Tracks
Switches
Slip Switches
Group Buttons
- Switch Group Buttons
- Signal Group Buttons
- Route Group Buttons
- RR Crossing Group Buttons
- Block Group Buttons
- Panel Group Buttons