SpDrS60 EN: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| Line 21: | Line 21: | ||
*[[RR Crossing Group Buttons]] | *[[RR Crossing Group Buttons]] | ||
*[[Block Group Buttons]] | *[[Block Group Buttons]] | ||
*[[Track Group Buttons]] | |||
*[[Panel Group Buttons]] | *[[Panel Group Buttons]] | ||
Revision as of 01:05, 12 November 2010
This page contains operating instructions for the Sp Dr S 60 signal box simulations developed by Signalsoft Rail Consultancy Ltd.
Tracks
Switches
Slip Switches
Group Buttons
- Switch Group Buttons
- Signal Group Buttons
- Route Group Buttons
- RR Crossing Group Buttons
- Block Group Buttons
- Track Group Buttons
- Panel Group Buttons