SpDrS60 EN: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
| Line 1: | Line 1: | ||
{{EnglishNav}} | |||
This page contains operating instructions for the '''Sp Dr S 60''' signal box simulations developed by Signalsoft Rail Consultancy Ltd. | This page contains operating instructions for the '''Sp Dr S 60''' signal box simulations developed by Signalsoft Rail Consultancy Ltd. | ||
| Line 31: | Line 32: | ||
== Control Panels == | == Control Panels == | ||
*[[Number Entry]] | *[[Number Entry]] | ||
{{EnglishNavBottom}} | |||
Revision as of 19:39, 12 July 2011
Contents | FAQ | Manual | General Tips and Tricks | Change Log | Multiplayer Manual | Line Operations Manual | Voice Communications | Change Log | Developers pages
This page contains operating instructions for the Sp Dr S 60 signal box simulations developed by Signalsoft Rail Consultancy Ltd.
Tracks
Switches
Slip Switches
Group Buttons
- Switch Group Buttons
- Signal Group Buttons
- Route Group Buttons
- RR Crossing Group Buttons
- Block Group Buttons
- Track Group Buttons
- Panel Group Buttons