Defects: Difference between revisions
Jump to navigation
Jump to search
| Line 23: | Line 23: | ||
''Not Currently Implemented''. | ''Not Currently Implemented''. | ||
Relative chance of occurring: 5/X | |||
===SignalAllFilaments=== | ===SignalAllFilaments=== | ||
Revision as of 16:32, 22 February 2017
Contents | Developers pages | Command Line Options | Timetables | Scenario Creation | Developing Installers
Operational Failures
These are defects involving rolling stock - things like locomotive power failures, defective brakes, and so on.
FullPowerLoss
PartialPowerLoss
CatenaryShortCut
DefectiveEmergencyBrake
PassengerEmergencyBrake
OverloadedTrain
LongPlatformStop
LongPlatformStop
BlockedNeighbour
Infrastructure Failures
These are defects involving the railway infrastructure - things like signal lamps not working, switches not being thrown or not locking, and so on.
SignalOneFilament
Not Currently Implemented.
Relative chance of occurring: 5/X
SignalAllFilaments
Not Currently Implemented.
SwitchObstruction
Implemented in Kleinstadt and BETA builds.
SwitchDefectiveEndContact
Implemented in Kleinstadt and BETA builds.
SwitchOutOfCorrespondenceAfterTrain
Not Currently Implemented.
LampIsDefective
TrackOccupationSpontaneous
TrackOccupationAfterTrain
ExitLockLightPersistence
Not Currently Implemented.