Dispatching in Stellwerk Herzogenrath: Difference between revisions

From SignalWiki
Jump to navigation Jump to search
No edit summary
 
(27 intermediate revisions by 3 users not shown)
Line 2: Line 2:


{{Sprachen_DE|DE=Örtliche Kenntnisse für Stellwerk Herzogenrath|EN=Dispatching in Stellwerk Herzogenrath|NL=Plaatselijke bekendheid in Stellwerk Herzogenrath}}
{{Sprachen_DE|DE=Örtliche Kenntnisse für Stellwerk Herzogenrath|EN=Dispatching in Stellwerk Herzogenrath|NL=Plaatselijke bekendheid in Stellwerk Herzogenrath}}
{{EnglishConstruction}}
 


Before you get your approval to run the service on a signal box, you need to find out about the local characteristics. After training as a general trainee signalman, dispatchers were always paired with a person skilled in the signal box. This chapter is the brief introduction to the area. Read it carefully. It contains very important information.
Before you get your approval to run the service on a signal box, you need to find out about the local characteristics. After training as a general trainee signalman, dispatchers were always paired with a person skilled in the signal box. This chapter is the brief introduction to the area. Read it carefully. It contains very important information.
Line 8: Line 8:
The text is "peer to peer" written as if you are in the signal box, the first day after training.
The text is "peer to peer" written as if you are in the signal box, the first day after training.


Have a more detailed look at the [http://www.signalsimulation.com/zoom/herzogenrath/ Sp Dr S 60-Stellwerk Herzogenrath panel] here.  
Have a more detailed look at the [https://signalsimulation.com/zoom/herzogenrath/ Sp Dr S 60-Stellwerk Herzogenrath panel] here.  


== Stellwerk Herzogenrath==
== Stellwerk Herzogenrath==
Line 20: Line 20:
===Neighbouring Dispatching Areas===
===Neighbouring Dispatching Areas===
====Line Landgraaf - Herzogenrath (yellow line)====
====Line Landgraaf - Herzogenrath (yellow line)====
The line from Herzogenrath towards Landgraaf is a cross-border route towards the Netherlands. The station there are Landgraaf and Heerlen. It is a non-electrified line and is regularly serviced by diesel multiple unita (DMU) of the series BR 642. Our neighbouring dispatcher here is the dispatcher in Landgraaf.
The line from Herzogenrath towards Landgraaf is a cross-border route towards the Netherlands. The station there are Landgraaf and Heerlen. It is a non-electrified line and is regularly serviced by diesel multiple unita (DMU) of the series BR 643.2. Our neighbouring dispatcher here is the dispatcher in Landgraaf.
All trains need to offered to the neighbour prior to sending it out.
All trains need to offered to the neighbour prior to sending it out. Track direction can only be changed via the [[Control Monitor Sp Dr S 600|DET]] with the command "EA,870".


[[File:KHEZ_Landgraaf.png|none|Landgraaf|760px]]
[[File:KHEZ_Landgraaf.png|none|Landgraaf|760px]]


====Line Stolberg - Herzogenrath (brown line)====
====Line Stolberg - Herzogenrath (brown line)====
The line from Stolberg to Herzogenrath is a part of the circle line around Aachen. It currently ends in Eschweiler St.Jöris, which is also the end point for services on of this route. It is a non-electrified line and is regularly service by BR ^42 DMU's. Our neighbour here is the dispatcher of Stolberg.
The line from Stolberg to Herzogenrath is a part of the circle line around Aachen. It currently ends in Eschweiler St.Jöris, which is also the end point for services on of this route. It is a non-electrified line and is regularly service by BR 643.2 DMU's. Our neighbour here is the dispatcher of Stolberg.
Offering trains is omitted here, as one train at the time may be on this line.
Offering trains is omitted here, as one train at the time may be on this line. Track direction can only be changed via the [[Control Monitor Sp Dr S 600|DET]] with the command "EA,890".
 
[[File:KHEZ_Eschweiler.png|none|Eschweiler|660px]]
[[File:KHEZ_Eschweiler.png|none|Eschweiler|660px]]


Line 47: Line 48:
Aufpassen solltest du hierbei wenn du von Kohlscheid aus ins Gegengleis Richtung Aachen West fahren möchtest. Da dir eine Weichenverbindung fehlt musst du du bereits ab Herzogenrath im Gegengleis fahren.
Aufpassen solltest du hierbei wenn du von Kohlscheid aus ins Gegengleis Richtung Aachen West fahren möchtest. Da dir eine Weichenverbindung fehlt musst du du bereits ab Herzogenrath im Gegengleis fahren.
[[File:KHEZ_Kohlscheid.png|none|Kohlscheid|760px]]
[[File:KHEZ_Kohlscheid.png|none|Kohlscheid|760px]]
===== Overview of endbuttons Kohlscheid =====
<br/>
{|  cellpadding="10" cellspacing="0" border="1"
|-
| '''(Start)/Target''' || '''Description'''
|-
| Kohlscheid - Herzogenrath normal track || 172II
|-
| Kohlscheid - Herzogenrath contra track || 152I
|-
| Kohlscheid - Üst Richterich normal track|| 171I
|-
| Kohlscheid - Üst Richterich contra track || 151I
|}
<br/>


==== Station of Herzogenrath ====
==== Station of Herzogenrath ====
The signals Asig A805 and F860, and the Asig N1 and P2 are equipped with auto-fleeting. However, this is not very useful as this will only set routes through the station via the main tracks and therefor you will have to intervene regulary. There are 4 platforms tracks in total, namelijk track 55, 1, 2 and 3. Track 55 is used for ending DMUs only, as that track is not electrified. Track 1, 2 and 3 can be used for regional trains having their stop here. You have to be aware that trains from Eschweiler St. Jöris can only be routed towards track 1 or 3, since switch 095 is just a crossing.
The signals Asig A805 and F860, and the Asig N1 and P2 are equipped with auto-fleeting. However, this is not very useful as this will only set routes through the station via the main tracks and therefor you will have to intervene regularly. There are 4 platforms tracks in total, namelijk track 55, 1, 2 and 3. Track 55 is used for ending DMUs only, as that track is not electrified. Track 1, 2 and 3 can be used for regional trains having their stop here. You have to be aware that trains from Eschweiler St. Jöris can only be routed towards track 1 or 3, since switch 095 is just a crossing.
 
[[File:KHEZ_Herzogenrath.png|none|Herzogenrath|760px]]
 
===== Overview of route end buttons Herzogenrath  =====
<br/>
{|  cellpadding="10" cellspacing="0" border="1"
|-
| '''Description''' || '''Endbutton'''
|-
| towards Eschweiler St. Jöris || F,yyy.890II
|-
| towards Geilenkirchen normal track || 880II
|-
| towards Geilenkirchen contra track || 860II
|-
| towards Landgraaf || F,yyy.870II
|-
| Herzogenrath - Kohlscheid normal track|| 850
|-
| Herzogenrath - Kohlscheid contra track|| 803
|}
<br/>
 
===== Overview of endbuttons Herzogenrath  =====
<br/>
{|  cellpadding="10" cellspacing="0" border="1"
|-
| '''(Start)/Target''' || '''Description'''
|-
| .N1 || straight D-Weg with Vmax
|-
| .N1R || D-Weg to the right with Vmax 60
|-
| .P2 || long D-Weg with Vmax
|-
| .P2K || short D-Weg with Vmax 60 up to W4
|-
| .P3 || long D-Weg on the mainline
|-
| .P3K || short D-Weg up to W6
|}
<br/>
 
===== Deviating S600 commands =====
 
For the signals and switches in the station area of Herzogenrath, the signal and switch numbers used for the DET differ from their numbers as indicated on the panel.
For example: The signal on the panel being labelled P001, has to be entered into the DET as just P1. Same applies for switches: to command switch 001 on the panel, just enter "1" for this switch.
Thus, omit any leading zeros of a signal or switch when entering commands for it into DET.
 
{|  cellpadding="10" cellspacing="0" border="1"
|-
| || '''Bl 1'''<br/>Inbound from left || '''Bl 2''' <br/>Outbound towards left || '''Bl 3''' <br/>Track direction
|-
| 1 || G890.P3 || N1.880II || EA,890
|-
| 2 || F860.P2 || F,N1,890II || EA,870
|-
| 3 || F860.P3 || F,N3,870II ||
|-
| 4 || H870.P3 || F,N3,890II ||
|-
| 5 || -  || N3.880II ||
|-
| || '''Bl 4'''<br/>Inbound from right || '''Bl 5''' <br/>Outbound towards right || '''Bl 6''' <br/>
|-
| 1 || A805.N1  || P2.850  ||
|-
| 2 || A805.N1P || P3.850 ||
|-
| 3 || A805.N3  || P4.850  ||
|-
| 4 || A805.N4  ||        ||
|-
| 5 || -        ||        ||
|}
<br/>


=== Train Announcement indicator (Anrückmelder)===
=== Peculiarities ===
==== Train Announcement indicator (Anrückmelder)====
A so-called "Anrückmelder" (Train Announcement indicator) has been installed due to the long distance between Eschweiler St. Jöris and our entry signal G890. This indicator starts to flash red when the train approaches the Esig G890. This is the sign for you to set the entry route into the station.  
A so-called "Anrückmelder" (Train Announcement indicator) has been installed due to the long distance between Eschweiler St. Jöris and our entry signal G890. This indicator starts to flash red when the train approaches the Esig G890. This is the sign for you to set the entry route into the station.  
[[File:KHEZ_Anrueckmelder_aktiv.png|none|Anrueckmelder|760px]]
[[File:KHEZ_Anrueckmelder_aktiv.png|none|Anrueckmelder|760px]]
Line 57: Line 151:
[[File:KHEZ_Anrueckmelder_aus.png|none|Anrueckmelder|760px]]
[[File:KHEZ_Anrueckmelder_aus.png|none|Anrueckmelder|760px]]


==="Buttons Locked"-indicator (Tastensperrmelder)===
===="Buttons Locked"-indicator (Tastensperrmelder)====
During the time a route is being set, the so-called "Tastensperrmelder" ("Buttons Locked"-indicator)will light up red. You will find these indicator for the stations of Kohlscheid and Herzogenrath. In case the indicator keeps blinking after the route has been set, you should check if the route has been set completely or that some part of the route is not set.
The so-called "[[Locked Buttons Indicator|Tastensperrmelder]]" ("Buttons Locked"-indicator) indicates the following:
[[File:KHEZ_Tastensperrmelder.png|none|Tastensperrmelder|320px]]
 
* dark (off) : when a route is set using the button on the panel.
* red : a route is being set using the DET or the auto-fleeting of a signal is currently setting a route.
* red blinking : the dispatcher has executed a command, which cannot be executed by the interlocking system (i.e. throwing a switch using the WGT, whilst the switch is (manually) locked)
 
You will find these indicator for the stations of Kohlscheid and Herzogenrath.
 
[[File:KHEZ_Tastensperrmelder.png|none|Tastensperrmelder|242px]]
 
==== Additional counters ====
 
In addition to the available auxiliary log printer, there are also two common counters for counting operations which are subject to logging. These counters also work in case the auxiliary log fails:
 
*Weichengesamtzählwerk - WGZ: counts all operations requiring logging related to switches.
[[File:KHEZ_WGZ.PNG|none|Weichengesamtzählwerk|241px]]
 
*Signal- und Fahrstraßengesamtzählwerk - SFGZ: counts all operations requiring logging related to signals and routes.
[[File:KHEZ_SFGZ.PNG|none|Signal- und Fahrstraßengesamtzählwerk|242px]]
 
==== Additional indicators - signal box Kohlscheid ====
 
Since signal box Kohlscheid is a remotely controlled signal box, some additional indicators are built into the panel providing information about the condition of signals and switches of the remotely controlled signal box.
 
*Indicator'''S''' (Signalstörmelder) : indicates that a signal has been extinguished in the area of signal box Kohlscheid.
*Indicator'''SFL''' (Signalfehlermelder) : indicates that a signal in the area of signal box Kohlscheid has a defect in a main filament of a lamp.
*Indicator'''W''' (Weichenstörmelder) :  indicates a malfunction malfunction of a switch in the area of signal box Kohlscheid.
*Indicator'''Ers''' (Ersatzsignalkontrollmelder) : indicates that none of the signals in the area of signal box Kohlscheid is showing the signal aspect Zs1 or Zs7. The indicator will be lit then. The indicator will be flashing as long as a signal over there is showing aspect Zs1 or Zs7.
 
[[File:KHEZ_Ers.PNG|none|Ersatzsignalkontrollmelder|242px]]
 
==== Remote control status indicators ====
 
Since the set routes are not fully displayed in the station Kohlscheid, there are some remote control status indicators for the signal box of Kohlscheid. These indicators give an optical feedback to the dispatcher about whether setting a route is being executed or not. The indicators have the following meaning:
 
* [[Remote Control Indicators|FGrM]] lit: there is no change in the area of responsibility of signal box Kohlscheid.
* [[Remote Control Indicators|FMB]] lit: a change is taking place in the area of responsibility of signal box Kohlscheid. For example, a route is being set or track section is getting occupied or unoccupied.
 
Note: Only one of the indicators "FBM" and "FGrM" will be lit at the same time when something is changing in the area of Kohlscheid. So they will be blinking in turn.
[[File:KHEZ FGRM.png|none|Fernsteuerbetriebsmelder|242px]]


==Overview Offering Trains Using DET==
==Overview Offering Trains Using DET==
Line 70: Line 202:


{{ShortNames:TableDetailsKHEZ|EN}}
{{ShortNames:TableDetailsKHEZ|EN}}
== Track lengths ==
{{TrackLengths:TableDetailsKHEZ|EN|Herzogenrath}}
{{TrackLengths:TableDetailsKKOS|EN|Kohlscheid}}
== Auto fleeting ==
{{Autofleet:TableDetailsKHEZ|EN}}


{{EnglishNavBottom}}
{{EnglishNavBottom}}

Latest revision as of 15:33, 19 November 2017

Contents | FAQ | Manual | General Tips and Tricks | Change Log | Multiplayer Manual | Line Operations Manual | Voice Communications | Change Log | Developers pages

Flag de.png Deutsch   Flag nl.png Nederlands


Before you get your approval to run the service on a signal box, you need to find out about the local characteristics. After training as a general trainee signalman, dispatchers were always paired with a person skilled in the signal box. This chapter is the brief introduction to the area. Read it carefully. It contains very important information.

The text is "peer to peer" written as if you are in the signal box, the first day after training.

Have a more detailed look at the Sp Dr S 60-Stellwerk Herzogenrath panel here.

Stellwerk Herzogenrath

Lines

Our signalbox is located along the following 3 lines:

  • 2543 Herzogenrath Grenze (border) - Herzogenrath
  • 2550 Aachen - Kassel
  • 2570 Stolberg - Herzogenrath (Ringbahn)

Neighbouring Dispatching Areas

Line Landgraaf - Herzogenrath (yellow line)

The line from Herzogenrath towards Landgraaf is a cross-border route towards the Netherlands. The station there are Landgraaf and Heerlen. It is a non-electrified line and is regularly serviced by diesel multiple unita (DMU) of the series BR 643.2. Our neighbouring dispatcher here is the dispatcher in Landgraaf. All trains need to offered to the neighbour prior to sending it out. Track direction can only be changed via the DET with the command "EA,870".

Landgraaf

Line Stolberg - Herzogenrath (brown line)

The line from Stolberg to Herzogenrath is a part of the circle line around Aachen. It currently ends in Eschweiler St.Jöris, which is also the end point for services on of this route. It is a non-electrified line and is regularly service by BR 643.2 DMU's. Our neighbour here is the dispatcher of Stolberg. Offering trains is omitted here, as one train at the time may be on this line. Track direction can only be changed via the DET with the command "EA,890".

Eschweiler

Line Aachen - Kassel (green line)

The electronic signal box (ESTW) Geilenkirchen took over de control of the section between Herzogenrath and Rheydt. At that same moment, the station of Übach-Palenberg was changed into a simple halt, where trains from both directions could have their stop. We can see this on the left side of the panel (tracks 9001 and 9004). On the left side, the line connects us with the station of Geilkirchen, with the dispatcher of Geilenkirchen as our neighbouring dispatcher. Field A9293 is used offer traffic on the contra track towards Geilenkirchen. Field A9003 is used for offering trains from Geilenkirchen on contra track .

Geilenkirchen

On the right side we have the line into the direction of Aachen West. The next controlled area there is Überleitstelle (Üst) Richterich, being controlled by our neighbouring dispatcher of Aachen West. Both track there have the possibility for GWB (running on contra track/left hand running). Offering trains towards Üst Richterich is done using field A151. Field A171 is used to offer trains coming from Üst Richterich on contra track.

Richterich

Stations and Sidings

Station of Kohlscheid

Der Bahnhof Kohlscheid wird von Herzogenrath aus Ferngesteuert. Hier steht vor Ort ein Dr S600 Stellwerk. In der Regel läuft der Bahnhof Kohlscheid alleine im Selbststellbetrieb. Regionalzüge halten hier gelegentlich, in der Regel solche mit der Relation Aachen - Eschweiler St.Jöris oder nach Landgraaf. Alle anderen Züge fahren hier durch. Aufpassen solltest du hierbei wenn du von Kohlscheid aus ins Gegengleis Richtung Aachen West fahren möchtest. Da dir eine Weichenverbindung fehlt musst du du bereits ab Herzogenrath im Gegengleis fahren.

Kohlscheid
Overview of endbuttons Kohlscheid


(Start)/Target Description
Kohlscheid - Herzogenrath normal track 172II
Kohlscheid - Herzogenrath contra track 152I
Kohlscheid - Üst Richterich normal track 171I
Kohlscheid - Üst Richterich contra track 151I


Station of Herzogenrath

The signals Asig A805 and F860, and the Asig N1 and P2 are equipped with auto-fleeting. However, this is not very useful as this will only set routes through the station via the main tracks and therefor you will have to intervene regularly. There are 4 platforms tracks in total, namelijk track 55, 1, 2 and 3. Track 55 is used for ending DMUs only, as that track is not electrified. Track 1, 2 and 3 can be used for regional trains having their stop here. You have to be aware that trains from Eschweiler St. Jöris can only be routed towards track 1 or 3, since switch 095 is just a crossing.

Herzogenrath
Overview of route end buttons Herzogenrath


Description Endbutton
towards Eschweiler St. Jöris F,yyy.890II
towards Geilenkirchen normal track 880II
towards Geilenkirchen contra track 860II
towards Landgraaf F,yyy.870II
Herzogenrath - Kohlscheid normal track 850
Herzogenrath - Kohlscheid contra track 803


Overview of endbuttons Herzogenrath


(Start)/Target Description
.N1 straight D-Weg with Vmax
.N1R D-Weg to the right with Vmax 60
.P2 long D-Weg with Vmax
.P2K short D-Weg with Vmax 60 up to W4
.P3 long D-Weg on the mainline
.P3K short D-Weg up to W6


Deviating S600 commands

For the signals and switches in the station area of Herzogenrath, the signal and switch numbers used for the DET differ from their numbers as indicated on the panel. For example: The signal on the panel being labelled P001, has to be entered into the DET as just P1. Same applies for switches: to command switch 001 on the panel, just enter "1" for this switch. Thus, omit any leading zeros of a signal or switch when entering commands for it into DET.

Bl 1
Inbound from left
Bl 2
Outbound towards left
Bl 3
Track direction
1 G890.P3 N1.880II EA,890
2 F860.P2 F,N1,890II EA,870
3 F860.P3 F,N3,870II
4 H870.P3 F,N3,890II
5 - N3.880II
Bl 4
Inbound from right
Bl 5
Outbound towards right
Bl 6
1 A805.N1 P2.850
2 A805.N1P P3.850
3 A805.N3 P4.850
4 A805.N4
5 -


Peculiarities

Train Announcement indicator (Anrückmelder)

A so-called "Anrückmelder" (Train Announcement indicator) has been installed due to the long distance between Eschweiler St. Jöris and our entry signal G890. This indicator starts to flash red when the train approaches the Esig G890. This is the sign for you to set the entry route into the station.

Anrueckmelder

The indicator will stop flashing, as soon as you have set the entry route.

Anrueckmelder

"Buttons Locked"-indicator (Tastensperrmelder)

The so-called "Tastensperrmelder" ("Buttons Locked"-indicator) indicates the following:

  • dark (off) : when a route is set using the button on the panel.
  • red : a route is being set using the DET or the auto-fleeting of a signal is currently setting a route.
  • red blinking : the dispatcher has executed a command, which cannot be executed by the interlocking system (i.e. throwing a switch using the WGT, whilst the switch is (manually) locked)

You will find these indicator for the stations of Kohlscheid and Herzogenrath.

Tastensperrmelder

Additional counters

In addition to the available auxiliary log printer, there are also two common counters for counting operations which are subject to logging. These counters also work in case the auxiliary log fails:

  • Weichengesamtzählwerk - WGZ: counts all operations requiring logging related to switches.
Weichengesamtzählwerk
  • Signal- und Fahrstraßengesamtzählwerk - SFGZ: counts all operations requiring logging related to signals and routes.
Signal- und Fahrstraßengesamtzählwerk

Additional indicators - signal box Kohlscheid

Since signal box Kohlscheid is a remotely controlled signal box, some additional indicators are built into the panel providing information about the condition of signals and switches of the remotely controlled signal box.

  • IndicatorS (Signalstörmelder) : indicates that a signal has been extinguished in the area of signal box Kohlscheid.
  • IndicatorSFL (Signalfehlermelder) : indicates that a signal in the area of signal box Kohlscheid has a defect in a main filament of a lamp.
  • IndicatorW (Weichenstörmelder) : indicates a malfunction malfunction of a switch in the area of signal box Kohlscheid.
  • IndicatorErs (Ersatzsignalkontrollmelder) : indicates that none of the signals in the area of signal box Kohlscheid is showing the signal aspect Zs1 or Zs7. The indicator will be lit then. The indicator will be flashing as long as a signal over there is showing aspect Zs1 or Zs7.
Ersatzsignalkontrollmelder

Remote control status indicators

Since the set routes are not fully displayed in the station Kohlscheid, there are some remote control status indicators for the signal box of Kohlscheid. These indicators give an optical feedback to the dispatcher about whether setting a route is being executed or not. The indicators have the following meaning:

  • FGrM lit: there is no change in the area of responsibility of signal box Kohlscheid.
  • FMB lit: a change is taking place in the area of responsibility of signal box Kohlscheid. For example, a route is being set or track section is getting occupied or unoccupied.

Note: Only one of the indicators "FBM" and "FGrM" will be lit at the same time when something is changing in the area of Kohlscheid. So they will be blinking in turn.

Fernsteuerbetriebsmelder

Overview Offering Trains Using DET

More information : Control Monitor Sp Dr S 600


Track Offering field Neighbour Example
9003 9003 Geilenkirchen ANB-456456,9003 + ZNS
9232 9232 Geilenkirchen ANB-789789,9232 + ZNS
151 151 Üst Richterich ANB-123123,151 + ZNS
171 171 Üst Richterich ANB-456456,171 + ZNS
870 - Landgraaf Tel.

Abbreviations

Short Name Full Name
KADA Alsdorf-Annapark
KADP Alsdorf-Poststraße
KAW Aachen West
KDAB Alsdorf-Busch
KEJS Eschweiler St.Jöris
KGEK Geilenkirchen
KHEZ Herzogenrath
KKOS Kohlscheid
KMAD Alsdorf-Mariadorf
KMK Herzogenrath A.Schmidt-Platz
KMKW Herzogenrath Alt-Merkstein
KRIC Üst Richterrich
KUBP Übach-Palenberg
KXH Herzogenrath Grenze
XNH Heerlen
XNLG Landgraaf

Track lengths

Herzogenrath

Track Length (m)
Herzogenrath 1 320
Herzogenrath 2 407
Herzogenrath 3 262
Herzogenrath 4 513
Herzogenrath 5 449
Herzogenrath 6 449
Herzogenrath 7 445
Herzogenrath 55 195

Kohlscheid

Track Length (m)
Kohlscheid 1 215
Kohlscheid 2 250

Auto fleeting

Signal Type Target
Bf Herzogenrath
ESig A805 SB-D ASig N001
ASig P002 SB-D 850
ESig F860 SB-D ASig P002
ASig N001 SB-D n.Geilenkirchen 880II
Bf Kohlscheid
ESig F152 SB-D Asig P102
ASig N101 SB-D n.Herzogenrath 172II
ASig P102 SB-D n.Richterich 171I
ESig A151 SB-D ASig N101

Contents | Sp Dr S 60 | FAQ | Manual | General Tips and Tricks | Multiplayer Manual | Line Operations Manual | Voice Communications | Change Log | Developers pages